Peel Region homepage
Peel Region
Go
main

Advance notice – Watermain improvement

Clarkway Drive. Project 19-1172

The Region of Peel anticipates building new watermains in your area within the next two years, as shown on the attached map. Watermains are underground pipes that bring tap water from our water treatment plants to your neighbourhood. As our population grows, we need to build larger watermains to keep providing high quality water services.

Important note

This upcoming construction will take place in the municipal right-of-way. The municipal right-of way includes the street and the land owned by your City between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.

Temporary restoration

The City of Brampton is planning to complete roadwork on your street within the next few years. Therefore, the Region of Peel’s repairs are temporary, as the City will complete restoration as part of their roadwork. The City will send you a separate notice about this additional construction.

Before construction begins

Before we start construction, you may notice several activities in your area:

  1. We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
  2. We may drill holes in the road or municipal right-of-way (the land between the street and your water service box) to collect soil samples, determine ground conditions, or confirm utility locations.
  3. We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.

We expect these activities to take place between June 2023 and end Dec 2023.

Keeping you informed

We are currently in the early planning stages, so we can’t give exact dates for when we will do the work.

In addition, as your city’s future planning activities may change, we may alter our plans to improve watermains in your neighbourhood. We will deliver more detailed information to your home or business closer to the proposed construction date.

Sign up for email notices

Receive timely updates right to your inbox by signing up for e-notices at peelregion.ca/construction.

Information on this project can also be found at peelregion.ca/pw/construction/bram/191172.asp

If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409