Watermain replacement and improvement

South Sheridan Way and Kiran Court. Project 13-1347H3

Peel Region will be improving the water system by increasing the water pressure in the pipes within your community. The purpose of this construction work is to maintain, improve and plan for future growth of existing water services as part of Peel’s commitment to providing safe, clean drinking water.

Your water pressure will increase at some point during the day as early as the week of February 20, and you will see a difference in the quantity of water flowing from your taps.

Higher pressure and your plumbing

You are responsible for the water pipes and plumbing fixtures on your property and in your home. If your plumbing was correctly constructed and inspected and is in good condition, you should have no concerns.

If your plumbing is not in good condition, you may notice:

If you have any concerns about your plumbing, we recommend you call a licensed plumber.

You are encouraged to be home on the date of the water service transfer in the event any plumbing issues arise, however, it is not required. A notice will be provided at least 48 hours in advance of the work to confirm the date.

Low-flow fixtures

When you had lower pressure, you may not have been able to use low-flow fixtures. With increased pressure, you will find changing to low-flow toilets, showers, or tap aerators will save both water and money. (Learn more at peelregion.ca/watersmartpeel).

Water interruptions

Your water supply will be interrupted as we switch your water service over. A notice will be provided at least 48 hours in advance of the work.

Staying informed

We will let you know if there are any major changes to the plans.

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.

Information on this construction project can also be found at peelregion.ca/pw/construction/miss/13-1347H3.asp.

This work will allow us to continue providing you with high quality tap water. If you have any questions or concerns, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409