Watermain abandonment

Fowler Lane. Project 13-1347H3

Peel Region will be working in your area to decommission an old watermain. Watermains are underground pipes that bring tap water from our water treatment plants to your area. As pipes age and our population grows, we need to replace older watermains to keep providing you with high quality water.

Construction schedule

Construction is planned to begin on November 15, 2023 and this stage of the work will be completed on or around November 22, 2023, as shown on attached map.These timelines are estimates, as weather and other unexpected events may impact our timelines.

All work is under warranty for two years from the completion date.

Sign up for email notices

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.

What to expect during construction

Learn what to expect during watermain construction by visiting peelregion.ca/construction/watermain and watching our short video. The video goes behind the scenes to show what happens before, during and after construction. This website also answers common questions about:

Contractor and working hours

The work will be completed by KAPP Infrastructure Inc. and supported by consultant GM BluePlan Engineering, both under contract to Peel Region. This contractor’s normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require your area to be under construction for a longer period of time.

Traffic and parking

We may need to temporarily close roads or reduce traffic to a single lane during construction. If we must reroute traffic, we will place signs giving directions. On-street parking will be reduced during construction when we are actively working on your street.

Interrupting your water supply

We do not anticipate that this construction project will require temporarily shutting off your water.

Areas impacted by construction

Excavation will be required in the vicinity of 2157 Fowler Lane. Excavation may cause temporary damage to roads, curbs, sidewalks, boulevards, lawns, and the bottom of driveways within the municipal right-of-way.

Any damage caused by Peel Region’s construction will be repaired.

Repairing areas impacted by construction

We will start repairing the road, curb, sidewalk, driveways, and lawns once the watermain abandonment work is complete.

Repairs may be delayed due to contractor availability or certain seasonal weather conditions.

For example:

Repairing grassy areas

The contractor will replace any damaged sod (grass) on the boulevard or your front lawn and will take care of the new sod for 30 days. You can help the sod stay healthy by watering it. A longer ‘deep root watering’ works better to establish new sod than watering more frequently for a shorter time. Watering in the early morning allows more water to soak in instead of evaporating.

Driveway access

It may be necessary to block your driveway for a short time when crews are completing other construction activities. If so, we will knock on your door to notify you. If a trench prevents access to your driveway, the contractor will have metal road plates available to allow access if required. Whenever possible, we will work to ensure businesses can be accessed. Please contact us if you have special needs related to access.

Waste collection

If you receive waste collection from Peel Region, your garbage, recycling, and organics will continue to be picked up on your regularly scheduled day. It is the contractor’s responsibility to move your garbage, recycling, and organics bins from the end of your driveway to a location where waste collection vehicles can pick them up. Empty containers will be returned to their corresponding addresses. Please make sure your house number is clearly marked on each bin. This helps us return empty bins to the correct address.

Vibrations

You could feel slight vibrations from the construction work.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Keeping you informed

We will let you know if there are any major changes to the plans.

Information on this project can also be found at peelregion.ca/pw/construction/miss/13-1347H3.asp.

Follow Peel Public Works on Twitter for project updates.

We value your feedback

After we have finished, we will invite you to provide feedback on the construction project.

You can sign up to receive this survey electronically at peelregion.ca/construction/signup.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409