Peel Region homepage
Peel Region
Go
main

Sanitary sewer, storm sewer and roadway improvements

Cadetta Road. Project 21-2710

Within the next two years, the Region of Peel and City of Brampton plan to begin the following work on Cadetta Road, as shown on the attached map:

Important note

This upcoming construction will take place in the municipal right-of-way. The municipal right-of way includes the street and the land owned by your city between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.

Before construction begins

Before we start construction, you may notice several activities on Cadetta Road:

  1. We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
  2. We may drill holes in the road or municipal right-of-way (the land between the street and property line) to collect soil samples, determine ground conditions, or confirm utility locations.
  3. We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.

We expect these activities to take place between March 2023 and August 2023.

Keeping you informed

We are currently in the early planning stages, so we can’t give exact dates for when we will do the work. We will deliver more detailed information to your business closer to the proposed construction date.

Sign up for email notices

Receive timely updates right to your inbox by signing up for e-notices at peelregion.ca/construction

If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409