Peel Region homepage
Peel Region
Exit text view
Go
main

Sanitary sewer replacement

Wellington Street West between Elizabeth Street South and Mill Street South. Project 18-1357

Peel Region will be working in your neighbourhood to replace the existing sanitary sewer system on Wellington Street West between Elizabeth Street South and Mill Street South. Sanitary sewers are underground pipes that carry wastewater from your neighbourhood to a wastewater treatment plant. Wastewater is created when water is flushed down the toilet, or goes down the drain in your sink, tub, or shower.

A new sanitary sewer will be installed, and we will replace the existing wastewater service pipes from your property line to the new sanitary sewer. We typically only replace the portion of the pipe within the municipal right-of-way leading from the property line to the new sanitary sewer, as it is the property owner’s responsibility to maintain the portion of pipe on your private property.

The contractor will need to dig a trench to install the new wastewater service pipe. If obstructions like trees or utilities prevent the replacement of the wastewater service pipe, we may need to reline the pipe instead of replacing it. To access the wastewater service pipe for cleaning and relining, we may need to dig a hole approximately two metres by two metres in size, close to your front property line.

Any damage caused by Regional construction will be repaired:

Schedule

We expect to start replacing the wastewater sewer and service pipes on Wellington Street South by the end of February. We expect to complete this work by the end of May 2024.

Once we have connected all properties to the new sanitary sewer, we will start repairing driveways, roads, curbs, sidewalks, and sod (grass). Please note that repairs may be delayed due to contractor availability or weather conditions.

For example:

Repair work completed as part of this construction project is under warranty for two years from the completion date.

Let's stay in touch:

We are requesting your contact information to allow us to keep you informed during this construction (this is voluntary). Your contact information will only be used for the purpose of contacting you for this project. It will not be shared or kept after the project is complete. Please contact our Project Ambassador, Avalon Myers at 416-457-3889 or avalon.myers@peelregion.ca so we can keep you updated with any construction that will directly affect your property.

Traffic and parking

We may need to temporarily close a section of your road or reduce traffic to a single lane during construction. If we must reroute traffic, we will place signs giving directions. On‐street parking will be reduced during construction when we are actively working on your street. Access to your driveway will be impacted for a short period of time. During this time, we will work with you to arrange for a parking restriction exemption on the neighbouring street.

Driveway repairs

If you would like to have the rest of your driveway paved, please contact the contractor, Pachino Construction, at 905‐660‐9978. The contractor will then share contact information for the company hired to do the paving repairs. Please remember this is your option. If you decide to have your entire driveway repaved, this extra paving work is your responsibility and outside the jurisdiction of Peel Region.

Contractor and working hours

The work will be completed by Pachino Construction under contract to Peel Region. This contractor's normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some temporary inconvenience, but shorter working days would require your neighbourhood to be under construction for a longer period of time.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Staying informed

Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup

Information on this project can also be found at peelregion.ca/downtownbramptonphase2 We will try to disturb you as little as possible, and we will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services. If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409