Watermain and sanitary sewer replacement and improvement

Humberwest Pkwy and Queen St East at Goreway Dr. Project 18-1169

Peel Region has been working in your neighbourhood to install watermains and sanitary sewers along Queen Street East. This work is required to maintain and improve existing water and wastewater services.

At this stage in the project, a temporary lane reduction will be required from January 15th to February 23rd.

Traffic Impacts

  • Northbound Humberwest Parkway will be reduced to two lanes from Queen Street East to just south of Goreway Drive.
    • The multi-use path / sidewalk in this area will remain open with partial diversion to the curb lane.
  • The Brampton Transit bus stops in this area will remain unaffected, including:
    • Goreway Drive Route 5: Stop ID 2485.
    • Humberwest Parkway Route 5: Stop ID 2486.
  • Two lanes of traffic in each direction will remain open at all times, unless notified otherwise.
  • Digital road signs will remain in place throughout the work and will be updated accordingly.

Please expect delays and choose alternate routes if possible.

We apologize for any delays or inconvenience resulting from these traffic impacts.

Keeping you informed

Weather and other unpredictable events may change the date of these traffic impacts. Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup.

Follow Peel Public Works on Twitter for project updates.

Information on this construction project can also be found at peelregion.ca/pw/construction/bram/18-1169.htm.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water and wastewater services. If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409